Manufacturing since 1979 · Exporting to 100+ countries

Send us your query

Fields marked with an asterisk are required.

Your enquiry details

Your local time. Leave both blank for any time.

Dip Moulded Components

Dip moulded components for cable joints and terminations, with guaranteed technical particulars in compliance with IEC 60502-4 and CENELEC HD 629.1.

  • IEC 60502-4
  • CENELEC HD 629.1
  • IEC 60502

Material properties

Technical Specifications

Guaranteed Technical Particulars in compliance with IEC 60502-4 & CENELEC HD 629.1
Guaranteed Technical Particulars in compliance with IEC 60502-4 & CENELEC HD 629.1
Test SequenceParameter for EvaluationTest Voltage Highest Voltage Umax(Kv)Result
122436
DC High Voltage Test (Dry)15 min.3876114No breakdown & no flashover
AC High Voltage Test (Dry)5 min.295786No breakdown & no flashover
AC High Voltage Test (Wet) (Only for OD Terminations)1 Min.25.45176No breakdown & no flashover
Partial Discharge Test--112233= 5 pC
Insulation Resistance (Before Impact Test)1 min. 500 V Dc------>10 3 O
Impact Test (For Straight Through Joints)--------PASS (No visual damage observed)
Insulation Resistance After Impact Test (Immersed)1 min. 500 V Dc------>10 3 O
Impulse Withstand Test at Elevated Temperature10 Positive& 10 Negative Conductor temperature 95 to 100 °C95125170No breakdown & no flashover
Heating Cycle Test in air3 cycles 5 hrs heating & 3 hrs cooling16 AC30 AC45 ACNo breakdown & no flashover
Partial Discharge Test at Elevated TemperatureConductor temperature 95 to 100 °C112233= 5 pC
Partial Discharge Test at ambient Temperature--112233= 5 pC
Heating Cycle Test in Air (for Indoor & Outdoor Termination)60 cycles , 5 hrs heating & 3 hrs cooling16 AC30 AC45 ACNo breakdown & no flashover
Heating Cycle Test in Water (for Straight Through Joint)63 cycles, 8 Hour Cycle, 5 hrs. heating & 3 hrs. cooling16 AC30 AC45 ACNo breakdown & no flashover
Immersion Test (for Outdoor Termination)10 cycles, 5 hr heating & 3 hr cooling------No breakdown & no flashover
Partial Discharge Test at Elevated Temperature5 hr heating & 3 hr cooling 95 to 100 °C112233= 5 pC
Partial Discharge Test at ambient Temperature--112233= 5 pC
Impulse Withstand Test at Ambient Temperature10 Positive & 10 Negative95 Peak125 Peak170 PeakNo breakdown & no flashover
AC High Voltage Test (Dry)15 min.163045No breakdown & no flashover
Examination--------PASS (No Cracking in the filling, no moisture path across primary seal, or Corrosion and/or Tracking)
DC High Voltage Test (Dry)15 min.3876114No breakdown & no flashover
AC High Voltage Test (Dry)5 min.295786No breakdown & no flashover
Thermal Short- Circuit TestTwo Short-circuits to raise conductors to ? sc of the cables------No visible damage
Impulse Withstand Test at Ambient Temperature10 Positive& 10 Negative95 Peak125 Peak170 PeakNo breakdown & no flashover
AC High Voltage Test (Dry)15 min.163045No breakdown & no flashover
Examination--------PASS (No cracking in the filling, no moisture path across primary seal, or Corrosion and/or Tracking)
Humidity Test for Indoor TerminationsWater conductivity 70?0.1 mS/m 300 hour spray8 AC16 AC24 ACPASS (No breakdown & no flashover, no Tracking, Erosion & Mechanical damage after test)
Salt Fog Test for Outdoor TerminationsSalt spray for 1000 hours (1.25 x Uo)7.9415.8723.75PASS (No breakdown & no flashover, no Tracking, Erosion & Mechanical damage after test)

Guaranteed Technical Particulars in compliance with IEC 60502, 60060 & 60230 For Termination upto 3.3 kv
Guaranteed Technical Particulars in compliance with IEC 60502, 60060 & 60230 For Termination upto 3.3 kv
Guaranteed Technical Particulars in compliance with IEC 60502, 60060 & 60230 For Termination upto 3.3 kv
Test SequenceParameter for EvaluationTest Voltage Highest Voltage Umax(Kv)Result
1.13.3
Insulation Resistance1 min. 500 V Dc.----10 3 O
AC High Voltage Test (Dry)15 min.48No breakdown & no flashover
Impulse Withstand Test at Ambient Temperature10 Positive& 10 Negative812No breakdown & no flashover
Heating Cycle Test63 cycles, 8 Hour Cycle, 5 hrs. heating & 3 hrs. cooling----No breakdown & no flashover
Insulation Resistance After Impact Test (Immersed)1 min. 500 V Dc---->10 3 O
Impulse Withstand Test at Elevated Temperature10 Positive& 10 Negative Conductor temperature 95 to 100812No breakdown & no flashover
Heating Cycle Test63 cycles, 8 Hour Cycle, 5 hrs. heating & 3 hrs. cooling----No breakdown & no flashover
DC High Voltage Test (Dry)5 min1521No breakdown & no flashover

Guaranteed Technical Particulars in compliance with IEC 60502, 60060 & 60230 For Straight Through Joints upto 3.3 kv
Guaranteed Technical Particulars in compliance with IEC 60502, 60060 & 60230 For Straight Through Joints upto 3.3 kv
Guaranteed Technical Particulars in compliance with IEC 60502, 60060 & 60230 For Straight Through Joints upto 3.3 kv
Test SequenceParameter for EvaluationTest Voltage Highest Voltage Umax(Kv)Result
1.13.3
Insulation Resistance1 min. 500 V Dc.----10 3 O
AC High Voltage Test (Joint immersed in water)15 min.3.56No breakdown & no flashover
Impulse Withstand Test at Ambient Temperature10 Positive& 10 Negative812No breakdown & no flashover
Insulation Resistance1 min. 500 V Dc---->10 3 O
Heating Cycle Test in Water (for Straight Through Joint)63 cycles, 5 hrs. heating & 3 hrs. cooling Conductor temperature 95 o----No breakdown & no flashover
Insulation Resistance After Impact Test (Immersed)1 min. 500 V Dc---->10 3 O
Impulse Withstand Test at Elevated Temperature10 Positive& 10 Negative Conductor temperature 95 to 100 °C812No breakdown & no flashover
DC High Voltage Test (Dry)5 min1521No breakdown & no flashover

Covered on this page

  • Test Specifications CABLINK

Applications

  • Cable termination and straight-through joint construction up to 3.3 kV
  • Dip-moulded sleeve/boot components for cable accessories

Standards & Compliance

  • IEC 60502-4
  • CENELEC HD 629.1
  • IEC 60502
  • IEC 60060
  • IEC 60230

FAQs

Frequently Asked Questions

What is the Dip Moulded Components used for?

It is used for:

  • Cable termination and straight-through joint construction up to 3.3 kV
  • Dip-moulded sleeve/boot components for cable accessories
Which standards and test methods are quoted for it?

These, with the values in the Technical Specification on this page:

  • IEC 60502-4
  • CENELEC HD 629.1
  • IEC 60502
  • IEC 60060
  • IEC 60230
Can I get a quote, a sample or a size that is not listed?

Send your cable details, quantity and application with the "Request a Quote or Sample" form at the foot of this page. For a size or variant that is not in the chart, describe what you need there, or use Technical support at the top of the page, and the technical team will confirm what can be supplied.

  • 47+

    Years manufacturing

  • 100+

    Countries served

  • 140

    Products in range

  • ISO 9001:2015

    Certified & tested

Need Dip Moulded Components for a live project?

Send us your requirement, call the plant directly, or take the datasheet with you.

Request a Quote or Sample

Tell us what you need — our technical team will get back to you.

Fields marked with an asterisk are required.

Your enquiry details